Bathrooms that feel like a hotel, built like a workhorse
The bathroom is one of the most-used rooms in the house and one of the most expensive to get wrong. We take it seriously โ proper waterproofing, custom tile work, vanities that fit the space, and lighting that actually flatters.
NFG Construction handles full bathroom gut remodels (down to the studs, new plumbing rough-in, all-new finishes) as well as straight refreshes. We do master suites, guest baths, kid baths, half baths and powder rooms.
What's included
- Full demo and disposal of existing fixtures
- New plumbing rough-ins โ shower, tub, vanity, toilet
- Schluter or comparable waterproofing system in showers
- Custom tile floors, walls, niches, and curbless or curbed showers
- Stone or quartz vanity tops
- Heated tile flooring (optional)
- New lighting plan โ vanity, ambient, exhaust
- Glass shower door installation
Custom tile is our favorite part
The difference between a good bathroom and a great one is usually the tile work โ the layouts, the niche details, the transitions. We take time to get those right. Our installers handle large-format porcelain, mosaic accents, herringbone and pattern work, marble and stone.
Timeline
A typical full bathroom gut runs 3โ5 weeks once materials are in hand. We line up cabinets, tile and fixtures before we start so the project doesn't sit waiting for deliveries.
Planning a bathroom remodel in Greater Boston & North Shore, MA? Call 508-216-0426 or request a free estimate.
Frequently Asked Questions
A typical full bathroom gut runs 3โ5 weeks once materials are in hand. We line up tile, vanities and fixtures before starting so the project doesn't sit waiting for deliveries.
Greater Boston bathroom remodels typically range from low-five-figures for refresh-style work to mid-five-figures for full master-bath gut renovations with custom tile, stone tops and walk-in showers.
Yes โ we use Schluter or comparable membrane systems, with proper sloped substrates and tile underlayment. Shower waterproofing is the part of bathroom work that fails most often when it's skipped, so we don't skip it.
Yes. We handle both curbed and curbless walk-in showers, including the proper substrate sloping required for curbless installs.